JANUARY 18TH PROGRESS UPDATE

A vigorous winter storm has made work on the project a little more interesting.
Moving heavy timber and lead on wet icy surfaces is a very challenging situation,
fortunately the shipwrights co-op has a very nice work shop for us to work in.
In addition the lead keel mold is receiving the last bit of work before heading to the foundry for casting,  and the new center board slot cap has been placed upon the keel to carry the bolt heads and act as a foundation for the floor timbers.
January 18th update.mov Watch on Posterous