From the category archives:

News

A VOLUNTEERS PERSPECTIVE

Friend and yachting correspondent Dieter Loibner traveled from Portland, Oregon to Port Townsend for a visit and to help with Martha’s refit.  I really think he just wanted to check up on us to see what it is we were up to,   Here’s Dieter. Martha and MutualismThe Power Wagon was a riot. Holly’s chicken soup [...]

Read the full article →

FEBRUARY 3rd PROJECT UPDATE

February 3rd up date.mov Watch on Posterous The spar layout continues in the Northwest Maritime Center Boat Shop with the birds mouth staves being scarphed, planed, and sawn. Final taper  layout will be completed and the taper will be sawn in Monday the 6th with a dry run assembly on the 8th and the glue [...]

Read the full article →

HERE’S THE VIDEO

lead keel placement.MOV Watch on Posterous

Read the full article →

PLACING THE LEAD BALLAST KEEL

Wednesday the 1st of February and the ballast is ready to bolt up to the hull.  Everyone is in high spirits and we even lured Doug Jones back from San Diego to work for a couple of more weeks. We are very impressed with the level of accuracy and production the crew is able to [...]

Read the full article →

LEAD KEEL ARRIVES

Monday January 30th and what a whirlwind. Chris and Gus of Olympic Boat Transport “and ballast keels” arrived in Port Townsend about 1330 hrs and we started to work the keel mold. Due to Gus’s schedule (moving another boat at 1600), we decided to disassemble the mold partially and use the mold structure to support [...]

Read the full article →

LEAD KEEL POUR part 2

LEAD KEEL POUR part 2.mov Watch on Posterous Here is part 2 pf the keel pour. We sure are pleased with the results so far, the mold held up very well and did it’s job admirably. The big concern had been excessive off gassing “smoking” and moisture expansion which would yield a poor finish and [...]

Read the full article →

JANUARY 27TH LEAD KEEL POUR

LEAD KEEL POUR part 1.mov Watch on Posterous Here’s the first movie installment of the pouring of the lead keel.   It was a great pleasure and very exciting to work with the folks at Non-ferrous metals.   The men there have a great deal of experience working in their trade and it shows in the efficiency [...]

Read the full article →

JANUARY 26TH LOAD AND LEVEL THE KEEL MOLD

What a week!!!!   With the new timber in place, Chris and David started shaping and fairing,  Greg continued with the mast step and floor timbers.    New bronze bolts were cut and  threaded by the good people of Port Townsend Foundry and Ossian split his time with keel bolts and rudder pintle and gudgeons. Annie worked [...]

Read the full article →

UPDATE Sunday January 22

The snow has melted for now and we are still making progress.   Chris and David were able to work on the timber inside the Shipwright’s building.   Using the the “Alaska Mill” they were able to remove large slabs of wood to match the shape of the keel (see movie “sawing timber”.)      Chris and Griswold [...]

Read the full article →

JANUARY 18TH PROGRESS UPDATE

A vigorous winter storm has made work on the project a little more interesting. Moving heavy timber and lead on wet icy surfaces is a very challenging situation, fortunately the shipwrights co-op has a very nice work shop for us to work in.In addition the lead keel mold is receiving the last bit of work [...]

Read the full article →